Letting No. |
Description |
Opening Date |
Results * |
1-09.1.8 |
PARTS FOR ELLICOT 370 DREDGE |
January 8, 2009 |
Click here |
2-09.1.15 |
SHINNECOCK CANAL TIDE/LOCK GATE REPLACEMENT, REPAIR AND SERVICE |
January 15, 2009 |
Click here |
3-09.1.22 |
METHANOL |
January 22, 2009 |
Click here |
4-09.1.29 |
MAINTENANCE AND REPAIR OF DIESEL ENGINES |
January 29, 2009 |
Click here |
5-09.2.5 |
POLYALUMINUM AND BASIC POLYALUMINUM CHLORIDE - (P.A.C.) |
February 5, 2009 |
Click Here |
6-09.2.12 |
OVERHAULING ALLISON AUTOMATIC TRANSMISSION |
February 13, 2009 |
Click here |
7-09.2.26 |
MIXED-IN-PLACE ASPHALT PAVEMENT RECYCLING BITUMINOUS PAVEMENT CONSTRUCTION MISCELLANEOUS CONCRETE PAVEMENT REPAIR ITEMS MISCELLANEOUS ASPHALT CONCRETE ITEMS MISCELLANEOUS DRAINAGE ITEMS PAVEMENT CRACK SEALING BITUMINOUS ASPHALT CONCRETE PAVEMENT REPAIR UTILIZING A MILLING MACHINE |
February 26, 2009 |
Click here |
8-09.3.5 |
CALCIUM HYPOCHORITE |
March 5, 2009 |
Click here |
11-09.3.5 |
METHANOL |
March 5, 2009 |
Click here |
9-09.3.12 |
CARBIDE SNOW PLOW BLADES |
March 12, 2009 |
Click here |
10-09.3.19 |
WOOD CHIPS FOR MULCHING |
March 19, 2009 |
Click here |
12-09.3.26 |
PARTS FOR ELLICOT DREDGES |
March 26, 2009 |
Click here |
13-09.4.2 |
DPW SLUDGE HAULING EQUIPMENT |
April 2, 2009 |
Click here |
14-09.4.9 |
RECONDITIONING AND REFURBISHING COUNTY VEHICLES AND EQUIPMENT |
April 9, 2009 |
Click here |
15-09.4.16 |
DPW EQUIPMENT |
April 16, 2009 |
Click here |
16-09.4.23 |
SIGNS AND ASSOCIATED ITEMS |
April 23, 2009 |
Click here |
17-09.4.30 |
BIO GUARDE II ODOR AND GREASE CONTROL |
April 30, 2009 |
Click here |
18-09.5.7 |
PARTS AND LABOR FOR CASE EQUIPMENT |
May 7, 2009 |
Click here |
19-09.5.14 |
JCB BACKHOE PARTS AND REPAIRS |
May 14, 2009 |
Click here |
20-09.5.21 |
DUMP TRUCK AND TRAILER COVERS |
May 21, 2009 |
Click here |
21-09.5.28 |
FREIGHTLINER PARTS AND REPAIRS FOR MEDIUM & HEAVY DUTY VEHICLES |
May 28, 2009 |
Click here |
22-09.6.4 |
SNOW PLOW NUTS AND BOLTS |
June 4, 2009 |
Click here |
23-09.6.11 |
RENTAL OF HEAVY EQUIPMENT |
June 11, 2009 |
Click Here |
24-09.6.18 |
FURNISH ROADWAY LIGHTING |
June 18, 2009 |
Click Here |
25-09.6.25 |
INSTALLATION OF SEWER PIPE AND APPURTENANCES |
June 25, 2009 |
Click Here |
26-09.7.2 |
M-B ROAD STRIPER PARTS |
July 2, 2009 |
Click Here |
27-09.7.9 |
PARTS AND LABOR FOR CASE CONSTRUCTION EQUIPMENT |
July 9, 2009 |
Click Here |
29-09.8.6 |
POTASSIUM PERMANGANATE |
August 6, 2009 |
Click Here |
34-09.8.20 |
DPW SPECIAL SERVICE CHASSIS AND BODY |
August 20, 2009 |
Click Here |
30-09.8.20 |
ROADWAY LIGHT INSTALLATION AND MAINTENANCE ON VARIOUS ROADS AND PARKING FACILITIES IN THE COUNTY OF SUFFOLK |
August 20, 2009 |
Click Here |
31-09.8.27 |
PARTS AND REPAIR FOR DRESSER/KOMATSU EQUIPMENT |
August 27, 2009 |
Click Here |
32-09.9.3 |
LANDSCAPING PLANTINGS AND RELATED WORK |
September 3, 2009 |
Click Here |
33-09.9.3 |
SEWAGE TREATMENT AND WET WELL CLEANING |
September 3, 2009 |
Click Here |
35-09.9.10 |
SNOW PLOW AND SPREADER PARTS II |
September 10, 2009 |
Click Here |
36-09.9.17 |
EXTRUDED POTASSIUM PERMANGANTE |
September 17, 2009 |
Click Here |
37-09.9.24 |
CALCIUM NITRATE SALES, SOLUTIONS, HYDROGREN SULFIDE, ODOR AND CORRECTION CONTROL |
September 24, 2009 |
Click Here |
38-09.10.1 |
ROAD SWEEPER REPLACEMENT PARTS |
October 1, 2009 |
Click Here |
39-09.10.22 |
DPW EQUIPMENT POWERED BY COMPRESSED NATURAL GAS (CNG) ENGINES & REPOWERING EXISTING DIESEL VEHICLES |
October 22, 2009 |
Click Here |
40-09.10.15 |
NON FLAMMABLE, NON GLYCERIN BASED SUPPLEMENTAL CARBON SOURCE |
October 15, 2009 |
Click Here |
41-09.10.29 |
LIQUID SODIUM HYPOCHLORINATOR DOSING UNIT |
October 29, 2009 |
Click Here |
42-09.11.19 |
IMPROVEMENTS TO SUFFOLK COUNTY DRAINAGE SYSTEMS |
November 19, 2009 |
Click Here |
43-09.12.3 |
SPECIAL PAVEMENT MARKINGS |
December 3, 2009 |
Click Here |
45-09.12.10 |
MASSEY FERGUSON BUCKET ATTACHMENT OR EQUAL |
December 10, 2009 |
Click Here |